Abstracts – Browse Results

Search or browse again.

Click on the titles below to expand the information about each abstract.
Viewing 11 results ...

Ahmad, H S, Ayoush, M D and Al-Alwan, M S (2019) Causes of delay to public infrastructure projects according to engineers representing different contract parties. Built Environment Project and Asset Management, 10(01), 153–79.

Aibinu, A A, Carter, S, Francis, V and Vaz-Serra, P (2019) Request for information frequency and their turnaround time in construction projects. Built Environment Project and Asset Management, 10(01), 1–15.

Ershadi, M J, Edrisabadi, R and Shakouri, A (2019) Strategic alignment of project management with health, safety and environmental management. Built Environment Project and Asset Management, 10(01), 78–93.

Eyiah-Botwe, E, Aigbavboa, C O and Thwala, W D (2019) Curbing PPP construction projects’ failure using enhanced stakeholder management success in developing countries. Built Environment Project and Asset Management, 10(01), 50–63.

Jalali, A, Hidzir, N I, Jaafar, M and Dahalan, N (2019) Factors that trigger bullying amongst subcontractors toward intention to quit in the construction projects. Built Environment Project and Asset Management, 10(01), 140–52.

  • Type: Journal Article
  • Keywords: Construction industry; Workplace bullying; Work organization; Construction culture; Intention to quit; Main contractor leadership;
  • ISBN/ISSN: 2044-124X
  • URL: https://doi.org/10.1108/BEPAM-01-2019-0001
  • Abstract:
    The purpose of this paper is to examine the relationships between three key factors that cause workplace bullying among subcontractor managers toward intention to quit the undertaken project within the context of Malaysia. Design/methodology/approach This study utilized the simple sampling method to select its study sample, while the questionnaire survey approach was implemented amidst 500 G6 and G7 contractor managers across Peninsular Malaysia. A total of 210 completed questionnaires were returned. Partial least square-structural equation modeling was administered to analyze the data via SmartPls 3.0 software. Findings This study discovered three significant factors (main contractor leadership, construction culture, work organization and job design) that displayed positive effect on workplace bullying among subcontractor managers toward intention to quit. The study outcomes can serve as a direction for policy makers to reduce bullying within the construction project environment. Practical implications This study serves as an instruction for main contractors to reinvent their style of management in overcoming bullying in construction projects. This paper guides that collaborative relationship among various parties in construction projects, including the representatives of main contractors and subcontractor managers, may assist in addressing the hostile environment of construction project, in order to create a constructive relationship between them that leads to overall project success. Originality/value Recognition of the three key factors that lead to workplace bullying among subcontractor managers in the construction industry, which are bound to enhance intention to quit based on the data set with strong statistical results, has made the research original.

Liu, S, Jin, H, Liu, C, Xie, B and Mills, A (2019) Investment apportionments among participants of PPP rental retirement villages. Built Environment Project and Asset Management, 10(01), 64–77.

Owolabi, H, Oyedele, L, Alaka, H, Ajayi, S, Bilal, M and Akinade, O (2019) Risk mitigation in PFI/PPP project finance. Built Environment Project and Asset Management, 10(01), 28–49.

Rethnam, O R, Palaniappan, S and Ashokkumar, V (2019) Life cycle cost analysis of 1MW power generation using roof-top solar PV panels. Built Environment Project and Asset Management, 10(01), 124–39.

Sayed, A M, Assaf, S, Aldosary, A S, Hassanain, M A and Abdallah, A (2019) Drivers of e-bidding implementation in the Saudi Arabian construction industry. Built Environment Project and Asset Management, 10(01), 16–27.

Tennakoon, G, Waidyasekara, A and Ekanayake, B (2019) Revisiting the role of professionals in designing buildings with low embodied and operational energy. Built Environment Project and Asset Management, 10(01), 110–23.

Ugulu, R A, Arewa, A and Allen, S (2019) Project-specific constraints influencing productivity of tradespeople in the Nigerian construction industry. Built Environment Project and Asset Management, 10(01), 94–109.